Skip to main content
Disruptive Process Solutions丨DPS
English

Manufacturing Scenario

Greenfield Food & Beverage Facilities

Connect site selection and facility development to the production model, utility requirements, growth phases, and the practical work needed before startup.

Prepare Your Project Brief

Start With The Decision

Confirm that the site and infrastructure can support the production model before committing to the facility layout.

Planning guidance, not a site-specific design. Confirm product requirements, technical scope, and acceptance criteria with your operations, engineering, and food safety teams.

A greenfield facility offers the opportunity to design the operation as a whole. It also introduces dependencies that an equipment-focused budget can miss: site access, utilities, permitting, drainage, building services, staffing, and commissioning. The planning task is to connect these dependencies to the products and volume the plant is intended to deliver.

Use the manufacturing scenarios overview to compare a new build with an expansion or modernization. If the existing operation still has usable capacity, the business case should explain why a new site is the appropriate choice.

Establish The Production And Investment Basis

Define product families, packaging formats, batch or continuous operations, expected demand, operating hours, and growth phases. Record what must be supported at startup and what may be added later. Separate a confirmed requirement from a forecast that needs further testing.

The capital planning and feasibility guide provides a method for comparing alternatives and recording uncertainty. Include the full operating model: people, material movements, sanitation, maintenance, storage, and distribution—not only the process line.

Evaluate The Site And Utility Constraints

Site review should consider access for deliveries and construction, ground conditions, available building area, drainage, wastewater arrangements, and the ability to expand. Confirm utility availability with the responsible providers rather than relying on a nearby connection as proof of suitable capacity.

Develop a utility demand basis for production, cleaning, peak conditions, and future phases. Check supply quality and pressure as well as quantity. Wastewater and treatment requirements can materially affect the facility concept and need early review with the relevant specialists and authorities.

Design Flows Before Rooms

Map ingredients, packaging, product, people, waste, and maintenance movement. Identify where hygienic separation, controlled access, temperature management, and cleaning infrastructure are needed. Establish the process relationships before fixing walls and circulation routes.

Reserve space for maintenance access and credible future phases. A spare plot area does not automatically provide an easy expansion path if utilities, road access, or shutdown requirements have not been considered.

Connect Design, Construction, And Procurement

Build a coordinated delivery sequence that shows when each area must be ready for equipment, utilities, inspections, testing, and operator training. The general contracting guide explains the trade and process interfaces that need ownership.

Long-lead equipment decisions should follow an agreed design basis and interface review. Record which dimensions, utility loads, and control requirements are confirmed, and which remain subject to supplier development. Procurement speed is not useful if it locks in an unsuitable process assumption.

The owner’s representation guide can help frame manufacturer-side approvals and readiness tracking across multiple delivery partners.

Prepare For Operational Startup

Recruitment, operating procedures, maintenance systems, food safety programs, training, and production release need to run alongside physical construction. Define which teams approve installation, functional testing, cleaning verification, and product trials.

Startup output may differ from established production. Include a ramp-up basis and a plan for dealing with unresolved issues. Do not use a target opening date as the sole evidence that the facility is ready to operate.

Planning Checklist

Bring:

  1. Product, packaging, demand, and operating assumptions for each growth phase.
  2. Site information, utility availability, and unresolved external dependencies.
  3. Process and material-flow concepts with hygiene and maintenance requirements.
  4. A project estimate, risk register, procurement plan, and approval structure.
  5. A startup plan covering people, procedures, testing, and operational release.

A greenfield concept becomes a credible project when the production basis, site constraints, delivery plan, and operating readiness requirements agree—not when the equipment layout looks complete.

Connect Planning With Production

Industry Requirements & Project Context

Compare these decisions with the relevant industry requirements and published project examples. A case describes its own scope and outcome, not a performance commitment for a different facility.

Published Case

Golden West Food Group — Co-Packing Plant Relocation

DPS relocated Golden West Food Group’s co-packing plant from Los Angeles to Fort Worth in 10 weeks, with zero supply chain disruptions.

Review Project Context

Connect The Next Decision

From Planning To Execution

Bring Your Project Requirements Into Focus

Share your product mix, capacity targets, current constraints, and project timeline. Start a conversation about the scope and decisions your project needs.