Proven Results · Real Projects
Case Studies
Explore how DPS has delivered profitable, on-time, and on-budget projects for food and beverage manufacturers across the United States and Canada.
Start Your Project
Featured Projects
Real Projects, Real Results.
Each case study reflects the DPS Design-Build-Manage methodology — single-point accountability, rigorous execution, and measurable outcomes for our clients.

Golden West Food Group — Co-Packing Plant Relocation
$18M facility delivered in just 10 weeks
- Total Investment
- $18M
- Weeks
- 10
- USDA Approval
- 100%
DPS relocated a value-added food processing operation from Los Angeles to Fort Worth — securing permits, managing cross-country machinery relocation, and commissioning the new facility in just 10 weeks with zero supply chain disruptions or customer delivery gaps.
Read Case Study
Ground Beef Line Execution — Confidential Client
350,000 lbs/week line in just 6 months
- lbs/week
- 350K
- Months
- 6
- Early Production
- Week 11
DPS delivered a high-volume ground beef processing line inside an active Los Angeles facility — engineering all disciplines in 4 weeks, managing 12 subcontractors, and activating early production by Week 11 to capture peak season revenue for a leading meat processor.
Read Case Study
Albertsons — CIP System & Air Farm Upgrade
Zero unplanned downtime across 3 outages
- Outages
- 3
- Each
- <4 hrs
- Downtime
- Zero
DPS replaced aging CIP assets and pneumatic air farm infrastructure at a high-volume Albertsons facility — executing all tie-ins across three brief planned outages using offsite prefabrication and minute-by-minute execution checklists, on budget and ahead of schedule.
Read Case Study
Albertsons Phoenix — Ice Cream Plant Upgrade
Four major systems installed in one Sunday
- Systems
- 4
- Sunday
- 1
- Minutes Lost
- Zero
DPS coordinated the simultaneous installation of four critical infrastructure systems — air compressor, dairy processing equipment, CIP, and refrigeration — within a single Sunday evening sanitation window at Albertsons’ Phoenix ice cream plant, with production resuming Monday morning at full capacity.
Read Case Study
Confidential Client — Pie Bakery Facility Overhaul
Complete facility overhaul in one month
- Month
- 1
- Overruns
- Zero
- Coordination
- Multi-Trade
DPS delivered a full facility overhaul of an active pie bakery — replacing refrigeration, piping, underground plumbing, and electrical systems within a non-negotiable one-month outage window through multi-trade coordination in a highly congested production environment.
Read Case StudyPlan Your Next Step
Connect Project Evidence With Your Planning Decisions
Use the manufacturing scenarios pillar to frame your own constraints before comparing published projects. A relocation readiness checklist and a startup acceptance plan help distinguish reusable planning questions from results specific to a particular case.
Review industry requirements alongside the project evidence, then bring a defined scope to the project inquiry form. The planning guides below are decision frameworks, not additional case studies or promises to reproduce a published result.
Scenario
Equipment & Plant Relocation
Treat relocation as a production-system project: assess the assets, prepare the destination, preserve equipment condition, and control the restart sequence.
Explore This GuideSolution
Commissioning & Production Startup Planning
Define the evidence, responsibilities, and readiness gates needed to move from installed equipment to controlled production and operational handover.
Explore This GuideScenario
Production Startup & Handover Readiness
Turn a fragmented startup punch list into a coordinated readiness plan with clear prerequisites, evidence owners, and release decisions.
Explore This GuideWe Build Profitable Projects
Ready to Build Your Next Project?
From greenfield facilities to targeted upgrades, DPS delivers honest, rigorous engineering and construction management. Let’s discuss how we can help you achieve your goals.