CASE STUDY • DAIRY / ICE CREAM

Albertsonsphoenix

Four major systems installed in one Sunday sanitation outage

Zero margin for error • Zero production disruption. Completed cleanly without impacting high-volume dairy and food processing schedules.

Ice Cream Plant • Dairy Processing Expertise

4 SYSTEMS • ZERO DISRUPTIONStainless steel processing tanks, sanitary pipework, and pressure instruments at the Phoenix ice cream plant
COMPLETED IN1 Sunday Outage

Phoenix Ice Cream Plant

Active Albertsons production operations

Dairy Processing Expertise

Hygienic valve and product safety integration

Single Outage Window

Tight sanitation interval execution

Zero Margin Execution

No errors or overruns permitted

PROJECT RESULTS

Four Critical Systems. One Window. Zero Margin for Error.

4

Outages

Installed simultaneously

1

Sunday Outage

Single sanitation window

0

Disruptions

Zero production impact

0

Margin

Zero tolerance for error

THE CHALLENGE

Install Four Major Systems in One Sunday Evening Sanitation Outage — with Zero Margin for Error.

Albertsons needed to upgrade critical infrastructure at their Phoenix ice cream plant: air compressor, dairy processing equipment, CIP system, and refrigeration — all within a single, tightly constrained Sunday sanitation window.

Any overrun would impact production. The project required deep dairy processing expertise, food safety-grade environmental control, and seamless integration with existing equipment.

DPS METHODOLOGY

Design • Build • Manage – Executed with Zero Margin

Stage One

DESIGN

Detailed coordination of air compressor, dairy processing equipment, CIP system, and refrigeration infrastructure. Full integration planning with existing ice cream production lines and food safety controls.

Stage Two

BUILD

Prefabrication and precise staging enabled all four systems to be installed simultaneously during the single Sunday evening sanitation outage with seamless integration.

Stage Three

MANAGE

Real-time coordination and contingency planning ensured flawless execution within the tight window, maintaining full food safety compliance and zero production disruption.

EXECUTION TIMELINE

Four Systems. One Sunday Evening. Zero Margin.

Completed with zero production impact

  1. PRE-OUTAGE

    Engineering & Staging

    Full coordination of air compressor, dairy equipment, CIP, and refrigeration systems. All components prefabricated and staged for rapid deployment.

  2. SUNDAY 6PM

    Sanitation Outage Begins

    All four systems installed simultaneously: air compressor, dairy processing equipment, CIP system, and refrigeration infrastructure.

  3. SUNDAY 10PM

    Integration & Testing

    Full system integration, food safety-grade environmental control verification, and seamless connection to existing production lines.

  4. SUNDAY 11PM

    Final Commissioning

    Complete testing and validation of all four systems with zero margin for error.

  5. MONDAY 6AM 🎉

    Production Resumes

    All systems fully operational. Zero production disruption. Ice cream plant running at full capacity.

NEXT STEP

Need Critical Systems Installed in a Single Tight Window?

Let’s discuss how DPS can deliver your next dairy or ice cream plant upgrade with the same zero-margin precision and operational continuity.

We respond within 4 business hours • All information is confidential