CASE STUDY • DAIRY / ICE CREAM
Albertsonsphoenix
Four major systems installed in one Sunday sanitation outage
Zero margin for error • Zero production disruption. Completed cleanly without impacting high-volume dairy and food processing schedules.
Ice Cream Plant • Dairy Processing Expertise

Phoenix Ice Cream Plant
Active Albertsons production operations
Dairy Processing Expertise
Hygienic valve and product safety integration
Single Outage Window
Tight sanitation interval execution
Zero Margin Execution
No errors or overruns permitted
PROJECT RESULTS
Four Critical Systems. One Window. Zero Margin for Error.
4
Outages
Installed simultaneously
1
Sunday Outage
Single sanitation window
0
Disruptions
Zero production impact
0
Margin
Zero tolerance for error
THE CHALLENGE
Install Four Major Systems in One Sunday Evening Sanitation Outage — with Zero Margin for Error.
Albertsons needed to upgrade critical infrastructure at their Phoenix ice cream plant: air compressor, dairy processing equipment, CIP system, and refrigeration — all within a single, tightly constrained Sunday sanitation window.
Any overrun would impact production. The project required deep dairy processing expertise, food safety-grade environmental control, and seamless integration with existing equipment.
DPS METHODOLOGY
Design • Build • Manage – Executed with Zero Margin
Stage One
DESIGN
Detailed coordination of air compressor, dairy processing equipment, CIP system, and refrigeration infrastructure. Full integration planning with existing ice cream production lines and food safety controls.
Stage Two
BUILD
Prefabrication and precise staging enabled all four systems to be installed simultaneously during the single Sunday evening sanitation outage with seamless integration.
Stage Three
MANAGE
Real-time coordination and contingency planning ensured flawless execution within the tight window, maintaining full food safety compliance and zero production disruption.
EXECUTION TIMELINE
Four Systems. One Sunday Evening. Zero Margin.
Completed with zero production impact
PRE-OUTAGE
Engineering & Staging
Full coordination of air compressor, dairy equipment, CIP, and refrigeration systems. All components prefabricated and staged for rapid deployment.
SUNDAY 6PM
Sanitation Outage Begins
All four systems installed simultaneously: air compressor, dairy processing equipment, CIP system, and refrigeration infrastructure.
SUNDAY 10PM
Integration & Testing
Full system integration, food safety-grade environmental control verification, and seamless connection to existing production lines.
SUNDAY 11PM
Final Commissioning
Complete testing and validation of all four systems with zero margin for error.
MONDAY 6AM 🎉
Production Resumes
All systems fully operational. Zero production disruption. Ice cream plant running at full capacity.
PROJECT GALLERY
Precision Installation in a Live Ice Cream Plant
CLIENT VOICE
“DPS installed four complex systems in one Sunday evening with absolute precision. Zero margin for error — and they delivered flawlessly. Production resumed Monday morning without a single minute lost.”
Plant Engineering Manager
Albertsons Phoenix Ice Cream Plant
IMPACT HIGHLIGHTS
- Systems installed
- 4 simultaneously
- Outage duration
- Single Sunday evening
- Production impact
- Zero minutes lost
NEXT STEP
Need Critical Systems Installed in a Single Tight Window?
Let’s discuss how DPS can deliver your next dairy or ice cream plant upgrade with the same zero-margin precision and operational continuity.
We respond within 4 business hours • All information is confidential